DKNY- Component Optimization

About the project
No items found.
Project Summary

Optimized a garment trim system to reduce retail theft and simplify manufacturing without compromising the DKNY brand experience. By redesigning the trim with a factory-sewn elongated-hole construction, the solution improved production efficiency while preserving design intent.

location

New York, NY

Client

DKNY

role

Led redesign and development of accessory hardware to address functional and security issues within an existing system.

Date

June 12, 2015

outcome

Improved performance and reduced loss risk, with a solution that integrated cleanly into production.

Production Thinking

Identified failure points and refined the component for durability, security, and ease of use—while maintaining design continuity.

Product SYSTEM

Targeted hardware component integrated into a broader accessories system, aligned with established standards and workflows.

Problem Opportunity

Existing hardware created vulnerability to theft and friction in use, requiring a redesign without disrupting the broader product line.